Hatraco has been awarded an order for the delivery of 1 x pneumatic start system to provide primary start energy for 2x Caterpillar
CG260-16 and 1 x Caterpillar CG260-12 driven gensets.
Hatraco has delivered two enclosed hydraulic start systems supporting vital operations in the Partitioned Neutral Zone between Kuwait and Saudi Arabia, Wafra.
Hatraco was awarded the propject to design, built and deliver a hydraulic start system as a secondary start system for a Fire Water Pump deployed at Petronas Chemicals MTBE.