Reliable FWP starting Power for a Strategic Energy Partnership.
Hatraco has delivered two enclosed hydraulic start systems for the Kuwait Oil Company (KOC) and Saudi Chevron, supporting vital operations in the Partitioned Neutral Zone between Kuwait and Saudi Arabia, Wafra. The canopy is built on a structural framework with removable panels, allowing full access for maintenance work.
As a cornerstone of regional energy supply, this field demands proven reliability. With our hydraulic starting technology, Hatraco ensures dependable performance, powering progress for one of the Gulf’s most important oil & gas partnerships.
TECHNICAL INFORMATION
Project | : | Wafra oil field |
End user | : | KOC/Chevron |
Location | : | Kuwait |
EPCC | : | -- |
Start capacity | : | 6 x 50 Litres |
Start requirements | : | 6 times 15 seconds each |
Recharge time | : | Within 30 minutes from 103.5-207 bar |
Engine | : | Caterpillar C18 diesel engine |
Required engine firing speed | : | 100-120 RPM |
Application | : | Secundary starting system for diesel engine driven FWP sets |
Design code / Certification | : | ASME VIII Div 1, U-stamped |
Specialties | : | Detachable Canopy for easy maintenance |
SS316 control panel | ||
Level 2 ITP coating requirements |
