Following the successful design and delivery of two air start systems for the North Field East Project, Hatraco has once again been selected to supply these systems for a follow-up development: the North Field South Project by QatarEnergy. The air start systems will again be used as the primary starting solution for Caterpillar® C18 diesel engine-driven fire water pump (FWP) sets.
This project is being executed in collaboration with the Japanese company Chiyoda and Technip Energies, the same joint venture responsible for the North Field development. The North Field South Project is a key component in the continued expansion of the world’s largest Liquefied Natural Gas (LNG) infrastructure.
TECHNICAL INFORMATION
Project | : | North Field South |
End user | : | Qatar energy |
Location | : | Qatar |
EPCC | : | Technip / Chiyoda |
Start capacity | : | 1x 1500 Litres |
Start requirements | : | 6 times 30 seconds each |
Recharge time | : | within 60 minutes from 6,5-30 bar |
Engine | : | Caterpiller C18 |
Required engine firing speed | : | 120 RPM |
Application | : | Primairy starting system for diesel engine driven FWP sets |
Design code / Certification | : | ASME VIII Div 1, U-stamped horizontally 1500Liter air receiver |
Specialties | : | Control panel for stand alone operation |