Hatraco proudly supplies Air Start Systems for a Petronas Gas Dehydration Plant in the Middle East.
Hatraco is proud to have delivered 3x advanced diesel driven compressor air Start Systems for Moteurs Baudouin 16M55 driven diesel gensets, serving the Gas Dehydration Plant in the Garraf Field, operated by Petronas.
The Garraf development is a key component in maintaining and optimizing gas production in the region. The Gas Dehydration Plant ensures the removal of moisture from natural gas before further processing and export. an essential step in achieving safe and efficient field operations.
By providing reliable and robust Air Start technology for these critical diesel generator sets, Hatraco supports the continuous and dependable power supply required for smooth operation of this vital energy infrastructure.
TECHNICAL INFORMATION
Project | : | Gas Dehydration Plant in the Middle East |
End user | : | Petronas |
Location | : | Middle East |
EPCC | : | PEG Italy |
Start capacity | : | 1 x 1000 Litres |
Start requirements | : | 6 times 5 seconds each |
Recharge time | : | Within 60 minutes from 6,5-30 bar |
Engine | : | Moteurs Baudouin 16M55 diesel engine |
Required engine firing speed | : | 100-120 RPM |
Application | : | Secundary starting system for diesel engine driven Gensets |
Design code / Certification | : | ASME VIII Div 1, U-stamped |
Specialties | : | Vertical air receiver |
Diesel driven, 30 bar, air compressor |