2x Air start systems for CAT® C32 FWP

Hatraco is proud to have delivered two advanced Air Start Systems for one of ADNOC’s largest oil and gas fields: the Bab Onshore Field, located 160 kilometers southwest of Abu Dhabi. 
The Bab Field Upgrade Project is a cornerstone in sustaining ADNOC’s production capacity. It involves the development of oil-producing wells, water injection wells, artificial lift wells, well-bays, let-down stations, water injection clusters, and essential infrastructure to ensure long-term operational efficiency. 

By supplying reliable secondary Air Start technology for Fire water pumps, Hatraco contributes to a save and seamless operation of this world-class project.


 

TECHNICAL INFORMATION
Project:Bab Far
End user:Adnoc
Location:Abu Dhabi
EPCC:Kent
Start capacity:1 x 1000 Litres
Start requirements :6 times 15 seconds each
Recharge time:Within 60 minutes from 6,5-30 bar
Engine:Caterpillar C32 diesel engine
Required engine firing speed  :100-120 RPM
Application:Secundary starting system for diesel engine driven FWP sets
Design code / Certification   :ASME VIII Div 1, U-stamped
Specialties:Vertical air receiver
   Nema4X Control panel, AWS D 1.1 welding
   NDE and coating requirements, Level 3 ITP