Hydraulic starting system for Ruya offshore project.
Hatraco designed, built and delivered a hydraulic start system with a capacity of 3x 50 liter accumulators sufficient to meet the minimum start duration requirement of 3x5 seconds of a MTU® 4000 driven E-genset. This MTU® 4000 drives a generator meant to provide energy in an emergency situation on one of the oil production platforms in the Al Shaheen field.
The Ruya offshore project is a major oil field development in Qatar, aimed at increasing oil production from the Al Shaheen field to 300,000 barrels per day. It is a multi-phase project led by the North Oil Company (NOC), a joint venture between QatarEnergy and Total.
The project involves building new platforms, subsea pipelines, and cables to maintain and increase the output of the Al Shaheen oilfield.
 
TECHNICAL INFORMATION
| Project | : | Ruya offshore | 
| End user | : | NOC – Qatar Energy | 
| Location | : | Middle East | 
| EPCC | : | Mc Dermott | 
| Start capacity | : | 3 x 50 Litres | 
| Start requirements | : | 3 times 5 seconds each | 
| Recharge time | : | Within 15 minutes from 0-207 bar | 
| Engine | : | MTU® 400 diesel engine | 
| Required engine firing speed | : | 100-120 RPM | 
| Application | : | Secundary starting system for diesel engine driven Gensets | 
| Design code / Certification | : | ASME VIII Div 1, U-stamped | 
| Specialties | : | Welding AWS D1.1, Weld book, WPS, NDE | 
| Electrical components and instrumentation Zone 1, IIB, T3 | ||
| C5M Coating | 
 